top of page
black blurred background.png

INSTALLATION GUIDE

EON Lithium batteries are fully compatible with Mecer inverters that have Modbus (RS485) communication capability. The setup guide will assist the installer with the correct configuration and setup of the inverter and battery. 

Note: these settings only apply to one battery. For multiple batteries, please follow the instructions in the manual as well as the best practices for paralleling batteries. 

Mecer Inverter
Parameters

Mecer Inverter Installation Guide

Download the inverter guide to view all the information.

black blurred background.png
LIb-protocol comaptible battery

The recommended shutdown % is 20% as it will prolong the battery life and deliver optimal performance. 

  • On the inverter settings menu go to setting 5 for Battery Type setting.

  • Select ‘’LIb’’ 

Battery Setting & Type

Battery Type Setting

black blurred background.png

Power cables 

  • Check the rating of the inverter and the battery pack that will be working together. Make sure that the correct gauge cable is used and the correct fuse protection. 

  • If the power rating of the battery is lower than the inverter, then make sure the maximum discharge current is set to conform to the battery power rating. 

Example: 

  • Inverter = 8kW (Max power is 8kW or 160A DC) 

  • Battery = 5kWh (Max power is 5kW or 100A DC) 

  • Set the maximum discharge current to 100A in the battery settings. 

  • For batteries connected in parallel, please see the best practices guide. 

Power and Communication Cable Connections

Battery Power
Battery Cable Connection
Explanation sheet

Communication cables 

The LI-ION port of the inverter to the RS485 port of the battery.

• The RS485 PIN outs are as follows:

Communication Cables
black blurred background.png

Parallel or Multiple battery Installation – EON Lithium Dip switch settings 

If you are using one battery, then set the DIP switches as the master or Battery 1. If you have multiple batteries in parallel, then follow the table below to set each battery accordingly. Also make sure to connect the supplied comms cable between the battery RS485 parallel ports (7 in following figure):

Switch Position Codes
bottom of page